Choose the right Type and SubType, fill the lines that are yours, leave the vendor's lines blank or as VTA, save, and export the datasheet.
Last updated: November 2026
A project to add the datasheet to (see the first guide). Datasheets are on every plan.
Open the project and press the + (Add) control in its Datasheets section. The Add Datasheet dialog opens.
Where: Projects
Choose Pump or Mixer in the Type list. The SubType list then fills in, and a SubType is required. For a pump: Paste is a positive displacement pump for thick paste with a yield stress (tailings paste, backfill, thickened tailings); Slurry is for thinner abrasive slurries; Water is for clean water. For a mixer: Paste is a twin-shaft paddle trough that blends solids, binder and water into a paste; Screw conveys the product while it mixes; Vortex is a high-shear mixer for short residence times. A short explanation appears under the lists and changes as you choose.
Enter the File Number (unique in the project), an optional Client File Number, the Name, the Description and the Revision Description, then press Add Datasheet. The datasheet opens in its editor.
A paste pump datasheet has the sections Product and Duty (product, solids, density, Yield stress (Bingham), Plastic viscosity (Bingham), particle size, flows), System (pipeline length and diameter, static head, Pressure required at the pump, Start-up pressure), Pump, Wear Protection and Materials, Drive and Controls, and Supply. A mixer has Product and Duty, Mixer, Wear Protection and Materials, Drive and Controls and Supply. Every line carries a badge saying who completes it: Purchaser (you), Vendor, or either. Fill the purchaser lines. The pressure lines come from your line calculation.
Guide: Size a paste pipeline and the pressure a paste pump needs →
In a vendor enquiry a line with a value is for the vendor to confirm, and a blank line is for the vendor to advise. To make the blanks explicit, press Fill blank values with "VTA" under the datasheet's list of revisions. It asks you to confirm how many empty text fields it will fill. VTA means vendor to advise: the enquiry treats it as a blank line, and the vendor sees no requested value. Nothing is saved until you press Save.
In the References tab add the sources of your values (a basis of design section, a test report) and pick one from the Ref. list beside a field. Then press the Save button at the bottom of the page. A reminder appears if changes stay unsaved for ten minutes.
Use Download PDF for a printable datasheet with a cover and the revision history, Word for a .docx, and Excel for a form for vendors (every line numbered, blank lines shaded). The file name carries the revision.
Once the datasheet has been issued or sent, make a new revision before you change it, so the earlier revision is kept as it was.
Guide: Revise a document: new revision, promote to numeric, compare →
Something here does not match what you see, or your question is not covered? Tell us.