Compare vendors and write the technical bid evaluation (TBE)

Compare the answers line by line, judge them, set gates and rules for the mandatory lines, score the criteria, record a recommendation and the award, and download the report.

← All guides

Before you start

The Management module, an issued enquiry, and at least one vendor that has returned its answers. Judging and evaluating needs the right to edit the project, or being an organisation admin.

1 Open the comparison

On the enquiry page press Compare vendors (it appears once the enquiry is issued). The lines run down the page and the vendors across, each answer coloured by its status, with the vendor's comment. Numeric lines mark the lowest and the highest value. Use the filters Only lines that need attention and Only lines where the vendors differ to cut the page down.

Where: Doc Control > Vendor Enquiries

Open Vendor Enquiries →

2 Give each answer a verdict

For each line and vendor choose Accept, Clarify (write the question) or Reject (write the reason). Accept all confirmed accepts every confirmed line without overriding a verdict you have already given.

3 Send clarifications

Press Send clarifications for a vendor with Clarify lines. The vendor gets a next round in which it sees and can change only those lines, with your question and its earlier answer. Tell the vendor by sending its link again (or a fresh Excel file). Back to the vendors at the foot of the matrix lists what is still open for each vendor.

4 Set gates and acceptance rules

Tick Gate beside a parameter that is mandatory. A vendor passes the gate when the line is accepted (or confirmed and not questioned), fails it when the line is rejected, and is pending otherwise. Under the Gate box you can set an acceptance rule: at least, at most, equal to, within a percentage of, between, or one of. Each value is then marked Meets rule or Outside rule. A verdict you give always wins over the rule.

5 Open the Technical bid evaluation

Press Technical bid evaluation on the enquiry or the comparison page. The page shows the result and ranking of the vendors, the gates, the criteria with scores, the recommendation and the report revisions.

6 Score the criteria

Under Criteria and scores press Add the standard criteria for a starting list (compliance, experience, QA and testing, documentation, spares and support, delivery fit) or Add a criterion for your own. Give each a weight (relative, they need not add up to 100) and score each vendor from 0 (no information or not met) to 4 (excellent), with a comment. The weighted score is the share of the best possible, in per cent. Commercial terms are not judged here.

7 Choose the result and write the recommendation

The page suggests a result for each vendor: not acceptable when a gate fails, acceptable subject to clarification while gates or topics are open, otherwise acceptable. You can choose a different result and add a note. Write the Recommendation and press Save the evaluation. The ranking puts vendors marked not acceptable last and orders the others by weighted score.

8 Track the documents you asked the vendors for

Under Documents required from the vendors add what you expect (data sheets, drawings, test certificates), tick each as it arrives and press Save the documents.

9 Download the report

Press PDF report or Excel. To label the report as an issued revision press Issue as Rev A (then B, C ...); a description is required. The report is built from the current data. It cannot yet be sent through a workflow or a transmittal: send the file yourself.

10 Record the award and take the values into your datasheets

In Award choose the vendor and press Award. Only a vendor that bid can be awarded, and recording it changes nothing in your datasheets. Then press Take ... values into the datasheets to see a preview of the vendor's advised and exception values, tick what you want, and press Make the new revisions. Each datasheet gets a new revision described as "As purchased", and the earlier revision is untouched. A datasheet edited since the enquiry is shown as a conflict and left alone.

Tips

  • Work through Only lines that need attention first: it shows exceptions nobody has accepted, lines with no answer, and anything marked Clarify or Reject.
  • The weights decide the ranking, so set them before you score, and write the reason for a low score in the comment.
  • Custom datasheets and uploaded documents cannot be updated with the vendor's values. A line that cannot be placed needs its datasheet to be opened and saved once.

Common mistakes

  • Looking for Compare vendors on a draft enquiry. The enquiry has to be issued first.
  • Awarding a vendor and expecting the datasheet to change. The values are taken in a separate step.
  • Reading the weighted score as a price comparison. The evaluation is technical only.

Something here does not match what you see, or your question is not covered? Tell us.