Compare the answers line by line, judge them, set gates and rules for the mandatory lines, score the criteria, record a recommendation and the award, and download the report.
Last updated: November 2026
The Management module, an issued enquiry, and at least one vendor that has returned its answers. Judging and evaluating needs the right to edit the project, or being an organisation admin.
On the enquiry page press Compare vendors (it appears once the enquiry is issued). The lines run down the page and the vendors across, each answer coloured by its status, with the vendor's comment. Numeric lines mark the lowest and the highest value. Use the filters Only lines that need attention and Only lines where the vendors differ to cut the page down.
Where: Doc Control > Vendor Enquiries
For each line and vendor choose Accept, Clarify (write the question) or Reject (write the reason). Accept all confirmed accepts every confirmed line without overriding a verdict you have already given.
Press Send clarifications for a vendor with Clarify lines. The vendor gets a next round in which it sees and can change only those lines, with your question and its earlier answer. Tell the vendor by sending its link again (or a fresh Excel file). Back to the vendors at the foot of the matrix lists what is still open for each vendor.
Tick Gate beside a parameter that is mandatory. A vendor passes the gate when the line is accepted (or confirmed and not questioned), fails it when the line is rejected, and is pending otherwise. Under the Gate box you can set an acceptance rule: at least, at most, equal to, within a percentage of, between, or one of. Each value is then marked Meets rule or Outside rule. A verdict you give always wins over the rule.
Press Technical bid evaluation on the enquiry or the comparison page. The page shows the result and ranking of the vendors, the gates, the criteria with scores, the recommendation and the report revisions.
Under Criteria and scores press Add the standard criteria for a starting list (compliance, experience, QA and testing, documentation, spares and support, delivery fit) or Add a criterion for your own. Give each a weight (relative, they need not add up to 100) and score each vendor from 0 (no information or not met) to 4 (excellent), with a comment. The weighted score is the share of the best possible, in per cent. Commercial terms are not judged here.
The page suggests a result for each vendor: not acceptable when a gate fails, acceptable subject to clarification while gates or topics are open, otherwise acceptable. You can choose a different result and add a note. Write the Recommendation and press Save the evaluation. The ranking puts vendors marked not acceptable last and orders the others by weighted score.
Under Documents required from the vendors add what you expect (data sheets, drawings, test certificates), tick each as it arrives and press Save the documents.
Press PDF report or Excel. To label the report as an issued revision press Issue as Rev A (then B, C ...); a description is required. The report is built from the current data. It cannot yet be sent through a workflow or a transmittal: send the file yourself.
In Award choose the vendor and press Award. Only a vendor that bid can be awarded, and recording it changes nothing in your datasheets. Then press Take ... values into the datasheets to see a preview of the vendor's advised and exception values, tick what you want, and press Make the new revisions. Each datasheet gets a new revision described as "As purchased", and the earlier revision is untouched. A datasheet edited since the enquiry is shown as a conflict and left alone.
Something here does not match what you see, or your question is not covered? Tell us.