Pit to ship: crush, screen into lump and fines, wash the fines, stockpile, rail, port.
An iron ore plant gets the ore ready to sell. Most of it is hard hematite ore that is already rich in iron, so the plant does not need to extract the iron chemically. It only breaks the rock to a size the steel works can use, sorts it by size and, where the ore is clayey, washes the clay off. This lesson describes that crush, screen and wash flowsheet. Some mines work magnetite ore instead. That ore is poorer, so it is ground fine and a magnet separates the iron mineral. That is a different flowsheet and it is not drawn here.
The ore leaves the plant in two products: lump, the coarse ore, and fines, the small ore. A stockpile, a train and a ship carry them to the customer. Ore comes from the pit (see open pit mining) and the stockpile and train handling is like that of a coal handling system.
This page is the map. Each big machine or area has its own lesson with its own animation: the primary crusher, ore screening, the wet scrubbing plant, the stacker-reclaimer and the ship loader. Click a machine in the animation to open its lesson.
The drawing is simplified. It shows one machine of each kind, and a real plant has several side by side. Lump takes the shorter path to a stockpile. The fines take the wet plant first.
Figures are typical and differ from ore to ore and plant to plant. A large plant typically handles from several thousand tonnes per hour of ROM ore. Lump is typically about a quarter to a third of the product and the rest is fines, but it depends on how the ore breaks. Wet plants typically send a few to about ten percent of the fines to slimes. A heavy haul train typically carries tens of thousands of tonnes, and a large bulk carrier typically takes 150,000 to 200,000 t.
Worked example. Assume a plant fed with 3,000 t/h of ROM ore for 7,000 hours a year. Assume the screen gives 30 percent lump and 70 percent fines, and the wet plant sends 8 percent of the fines to slimes. Assume trains of 28,000 t, ships of 180,000 t, a shiploader rate of 6,000 t/h, a rail line of 400 km and a train speed of 50 km/h.
| Quantity | Working | Result |
|---|---|---|
| Primary crusher reduction ratio | 1,000 mm ÷ 200 mm | 5 to 1 |
| Lump | 3,000 × 0.30 | 900 t/h |
| Fines to the wet plant | 3,000 × 0.70 | 2,100 t/h |
| Slimes | 2,100 × 0.08 | 168 t/h |
| Washed fines | 2,100 − 168 | 1,932 t/h |
| Product (lump and washed fines) | 900 + 1,932 | 2,832 t/h |
| Product per year | 2,832 × 7,000 | 19,824,000 t (about 19.8 million t) |
| Trains per year | 19,824,000 ÷ 28,000 | 708 trains, about 1.9 a day |
| Ships per year | 19,824,000 ÷ 180,000 | about 110 ships |
| Time to load one ship | 180,000 ÷ 6,000 | 30 hours |
| Rail time, one way | 400 ÷ 50 | 8 hours |
The plant sends away about 6 percent of its feed as slimes (168 ÷ 3,000 = 0.056) and sells the rest. Most of the cost sits after the plant, in the rail line and the port, which is why the stockpiles and the loading rates matter so much.
Assumed inputs, not data from a particular plant. Size limits, the lump share, the slimes share and the train and ship sizes depend on the ore and on the operation.
Safety: the plant has heavy moving machines, falling rock, large trucks and trains, and dust from crushing and handling that can harm the lungs. Plants use dust control, guards, exclusion zones and isolation before work. This lesson is education, not a procedure.
The pieces that are still too big for the product are crushed again, so every piece that leaves the circuit is below the size limit. This is called a closed circuit.
Clay sticks to small particles and spoils their quality, while coarse lump is mostly clean. In the example the wet plant takes 8 percent of the fines away as slimes.
The plant runs steadily but the train loads in bursts. The pile takes up the difference, so one does not have to stop for the other.