What an iron ore processing plant does

An iron ore plant gets the ore ready to sell. Most of it is hard hematite ore that is already rich in iron, so the plant does not need to extract the iron chemically. It only breaks the rock to a size the steel works can use, sorts it by size and, where the ore is clayey, washes the clay off. This lesson describes that crush, screen and wash flowsheet. Some mines work magnetite ore instead. That ore is poorer, so it is ground fine and a magnet separates the iron mineral. That is a different flowsheet and it is not drawn here.

The ore leaves the plant in two products: lump, the coarse ore, and fines, the small ore. A stockpile, a train and a ship carry them to the customer. Ore comes from the pit (see open pit mining) and the stockpile and train handling is like that of a coal handling system.

This page is the map. Each big machine or area has its own lesson with its own animation: the primary crusher, ore screening, the wet scrubbing plant, the stacker-reclaimer and the ship loader. Click a machine in the animation to open its lesson.

How it works

The drawing is simplified. It shows one machine of each kind, and a real plant has several side by side. Lump takes the shorter path to a stockpile. The fines take the wet plant first.

  1. 1Pit and haul trucks. The ore is drilled and blasted in benches and loaded by excavators. Large haul trucks carry the run-of-mine (ROM) ore up the ramp to the crusher station. They back onto a platform and tip the load into the dump pocket.
  2. 2Primary crusher. The primary crusher takes the biggest lumps, typically up to about 1 m across, and breaks them to about 150 to 250 mm. The drawing shows it cut open. The moving cone squeezes the rock against the fixed shell and the broken ore falls out the bottom onto a conveyor.
  3. 3Secondary and tertiary crushing. A conveyor lifts the ore to a secondary cone crusher, then another conveyor carries it to a tertiary cone crusher. Each stage makes the ore smaller, so that most of it ends up below about 30 to 40 mm. The crushers are drawn as glass so you can see the cone and the gap.
  4. 4Screening into lump and fines. A vibrating double deck screen sorts the ore by size. The top deck holds back the oversize, which returns to the tertiary crusher, so the circuit is closed. The lower deck splits the rest. Ore that stays on it is lump, typically about 6 to 30 mm. Ore that falls through is fines, below about 6 mm.
  5. 5Wet scrubbing and cyclones (where the ore is clayey). The fines go into a rotating scrubber drum with water. The tumbling breaks the clay off the ore. A pump sends the slurry to a cyclone. The washed ore leaves with the underflow, and the water with the clay slimes leaves with the overflow and goes by pipe to a pond or a tailings storage. A dry plant leaves this step out.
  6. 6Stockpile and reclaim. Lump and fines are stacked on separate stockpiles. A stacker-reclaimer on rails builds the pile and later digs it with a bucket wheel. The stockpile evens out the difference between the plant, which runs steadily, and the trains, which come and go.
  7. 7Rail and port shiploader. A reclaim conveyor fills a loadout bin, and the bin fills the wagons of a long train (see train loading). The train runs along the rail line, which can be several hundred kilometres long, to the port. There the wagons are emptied onto a conveyor, and a shiploader carries the ore on its boom and drops it into the holds of a bulk carrier.

The numbers

Figures are typical and differ from ore to ore and plant to plant. A large plant typically handles from several thousand tonnes per hour of ROM ore. Lump is typically about a quarter to a third of the product and the rest is fines, but it depends on how the ore breaks. Wet plants typically send a few to about ten percent of the fines to slimes. A heavy haul train typically carries tens of thousands of tonnes, and a large bulk carrier typically takes 150,000 to 200,000 t.

Worked example. Assume a plant fed with 3,000 t/h of ROM ore for 7,000 hours a year. Assume the screen gives 30 percent lump and 70 percent fines, and the wet plant sends 8 percent of the fines to slimes. Assume trains of 28,000 t, ships of 180,000 t, a shiploader rate of 6,000 t/h, a rail line of 400 km and a train speed of 50 km/h.

QuantityWorkingResult
Primary crusher reduction ratio1,000 mm ÷ 200 mm5 to 1
Lump3,000 × 0.30900 t/h
Fines to the wet plant3,000 × 0.702,100 t/h
Slimes2,100 × 0.08168 t/h
Washed fines2,100 − 1681,932 t/h
Product (lump and washed fines)900 + 1,9322,832 t/h
Product per year2,832 × 7,00019,824,000 t (about 19.8 million t)
Trains per year19,824,000 ÷ 28,000708 trains, about 1.9 a day
Ships per year19,824,000 ÷ 180,000about 110 ships
Time to load one ship180,000 ÷ 6,00030 hours
Rail time, one way400 ÷ 508 hours

The plant sends away about 6 percent of its feed as slimes (168 ÷ 3,000 = 0.056) and sells the rest. Most of the cost sits after the plant, in the rail line and the port, which is why the stockpiles and the loading rates matter so much.

Assumed inputs, not data from a particular plant. Size limits, the lump share, the slimes share and the train and ship sizes depend on the ore and on the operation.

Safety: the plant has heavy moving machines, falling rock, large trucks and trains, and dust from crushing and handling that can harm the lungs. Plants use dust control, guards, exclusion zones and isolation before work. This lesson is education, not a procedure.

What the operator watches

  • Crusher loads and settings. The power the crushers draw and the gap they are set to decide the product size and how much the screen has to return.
  • Screen and product size. Samples show whether the lump and the fines stay inside their size limits.
  • Product quality. Samples are analysed for iron and for the unwanted elements, and the stockpile is built so the quality stays even.
  • Wet plant water and slimes. The water supply, the cyclone pressure and the pond level show whether the washing works.

Common problems

  • Clay and wet ore. Sticky ore blocks chutes, blinds the screen deck and builds up on belts.
  • Worn crusher liners. The product gets coarser and the screen returns more oversize.
  • Dust. Crushing and transfer points make dust, so they need sprays or extraction.
  • Stockpile mix-ups. Lump and fines of different grades must stay on separate piles, or the shipment may miss its specification.

Words you will meet

ROM ore
Run-of-mine ore: ore as it comes from the pit.
Lump
The coarse product, typically about 6 to 30 mm.
Fines
The small product, below the lump size.
Closed circuit
A crusher whose oversize returns from the screen for another pass.
Scrubber
A rotating drum that washes clay off the ore.
Slimes
The very fine clay washed out of the ore, with water.
Stockpile
A pile of ore kept as a buffer between the plant and the train.
Stacker-reclaimer
A machine on rails that builds a stockpile and digs it again.
Shiploader
The machine that puts the ore into the ship.
Bulk carrier
A ship made to carry loose cargo such as ore.

Check your understanding

Why is the screen oversize sent back to the crusher?

The pieces that are still too big for the product are crushed again, so every piece that leaves the circuit is below the size limit. This is called a closed circuit.

Why are the fines washed and the lump not?

Clay sticks to small particles and spoils their quality, while coarse lump is mostly clean. In the example the wet plant takes 8 percent of the fines away as slimes.

Why keep a stockpile between the plant and the train?

The plant runs steadily but the train loads in bursts. The pile takes up the difference, so one does not have to stop for the other.

Key facts

Products
Lump (coarse) and fines (small), sold by size and grade.
Crushing
Three stages: primary, secondary and tertiary. The screen returns the oversize.
Wet plant
Only where the ore is clayey: a scrubber drum and a cyclone.
Transport
Stockpile, rail line, port shiploader, bulk carrier.
Other ore
Magnetite ore is ground and sorted with magnets instead.
Use the animation
The animation is clickable: click a machine that has its own lesson to open it. Follow the ore from the pit truck through the three crushers to the screen. The lump goes straight to its stockpile. The fines pass the scrubber drum and the cyclone first, and the slimes go to the pond. Then follow the ore to the stockpiles, the train and the ship. Colours: lump is dark red-brown, fines are orange, slimes are grey-brown and water is blue. Look at the glass crushers, the glass screen side, the glass drum and the glass cyclone to see the inside. The numbers on the drawing match the numbered steps under How it works. Hover over any part for its name and what it does.