Grind, leach with acid, extract, precipitate, dry: ore to yellowcake, principles only.
Uranium is a heavy metal that is mined for fuel for nuclear power stations. The ore holds very little uranium, often a fraction of one percent, so a plant has to separate a small amount of uranium from a large amount of rock. The product is a concentrate of uranium oxide, called yellowcake, packed in drums. Fuel is made from it elsewhere, in other plants.
There are two main routes. In a conventional plant the ore is mined, crushed, ground and leached with acid, and the uranium is taken out of the solution. In in-situ recovery the ore stays in the ground and a solution is pumped through it. The two routes share the last steps. Each major unit has its own lesson: click it in the animation. This lesson is education about principles. Uranium and its products are radioactive and tightly regulated: licences, radiation protection rules and safeguards apply to every step, and nothing here is a procedure.
In the conventional route the solids go one way, from the ore to the tailings, and the uranium goes with the liquid from the leach to the drums.
Typical figures, which depend on the ore and the plant: an ore of roughly 0.05 to 0.3 percent U3O8; grinding to roughly 0.1 to 0.5 mm; a leach slurry of roughly 35 to 50 percent solids at a pH of about 1 to 2 and a temperature of roughly 30 to 50 °C; a leach of roughly 6 to 24 hours; an acid use of roughly 10 to 50 kg for each tonne of ore; and an overall recovery of roughly 85 to 95 percent.
Worked example. Assume 1,000 t of ore a day at 0.10 percent U3O8, a leach that dissolves 92 percent, a recovery of 98 percent of the dissolved uranium through extraction and precipitation, a product of 75 percent U3O8, drums of 400 kg, an acid use of 25 kg/t, a leach slurry of 40 percent solids with a density of 1.34 t/m³, a leach time of 12 hours, and three leach tanks.
| Quantity | Working | Result |
|---|---|---|
| Uranium in the ore | 1,000 t/day × 0.10 percent | 1.0 t/day of U3O8 (1,000 kg) |
| Dissolved in the leach | 1,000 × 0.92 | 920 kg/day |
| Recovered as product | 920 × 0.98 | 901.6 kg/day |
| Overall recovery | 0.92 × 0.98 | 90.2 percent |
| Dry product at 75 percent | 901.6 ÷ 0.75 | about 1,202 kg/day |
| Drums of 400 kg | 1,202 ÷ 400 | about 3 a day |
| Acid | 1,000 t × 25 kg/t | 25 t/day |
| Slurry flow at 40 percent solids | (1,000 ÷ 24 = 41.7 t/h of ore) ÷ 0.40 | 104.2 t/h, or 77.7 m³/h at 1.34 t/m³ |
| Leach volume at 12 hours | 77.7 m³/h × 12 h | 933 m³, three tanks of about 311 m³ |
Assumed inputs, not data from a particular plant. A real plant has losses to the tailings, a bleed to keep impurities down, and often several leach and wash stages.
Safety: the acid, the organic liquid and the reagents are hazardous, and the ore, the process liquids, the product and the tailings are all radioactive to some degree. This lesson is education about principles. Uranium and its products are radioactive and tightly regulated: licences, radiation protection rules and safeguards apply to every step, and nothing here is a procedure.
The uranium is held inside the mineral grains. Fine grinding lets the acid reach them, so more of the uranium dissolves in the time available.
The leach solution is large and holds many other dissolved metals. Solvent extraction picks out the uranium and puts it in a small volume of clean solution, so that precipitation makes a clean, concentrated product.
In a conventional plant the ore is dug up, ground and leached at the surface, and ground rock is left as tailings. In in-situ recovery the ore stays in the ground, and only the solution is brought up.