Slurry, thickened, paste and dry stack storage, and the three ways to raise a wall.
Tailings are what is left of the ore after the valuable mineral has been taken out: finely ground rock and water. They have to be stored safely for a very long time. The main difference between the storage methods is how much water the tailings still carry when they are placed. Less water means less to hold back, but more equipment in the plant.
The animation shows four ways of placing tailings at the front and, behind them, three ways of raising a wall. The base case is explained in the tailings storage facility lesson. The plant steps are in the paste thickener, paste backfill plant and vacuum disc filter lessons. The dry stack has its own lesson, dry stack tailings. The water that each method saves or stores is part of the mine water balance.
The first four steps are about the water in the tailings. The last three are about how a wall is raised when there is one.
Raising methods apply where there is a wall: slurry, thickened and sometimes paste. A dry stack has no wall to raise.
Typical features of the four ways of placing tailings. The figures overlap and change with the ore, the plant and the site:
| Method | Typical solids by weight | Free water on the facility | Wall |
|---|---|---|---|
| Conventional slurry | About 30 to 45 percent | Large pond | Yes |
| Thickened | About 50 to 65 percent | Small pond | Yes, usually smaller |
| Paste | About 65 to 80 percent | Almost none | Small berms, if any |
| Dry stack | About 80 to 90 percent | None | No dam; a drained stack |
The beach slope grows from about 1 to 3 percent for slurry to a few percent for thickened tailings and several percent for paste. A dry stack is built at an overall slope of roughly 3 horizontal to 1 vertical. The drawing is not to scale: the slopes and the heights are exaggerated so that the shapes can be compared.
Worked example. Assume 100 t/h of dry solids, 8,000 operating hours a year, and the solids contents shown. The slurry mass is the dry solids divided by the solids fraction. The water is the slurry minus the dry solids.
| Quantity | Working | Result |
|---|---|---|
| Slurry at 35 percent solids | 100 ÷ 0.35 | 285.7 t/h, of which water 185.7 t/h |
| Thickened at 55 percent solids | 100 ÷ 0.55 | 181.8 t/h, of which water 81.8 t/h |
| Paste at 70 percent solids | 100 ÷ 0.70 | 142.9 t/h, of which water 42.9 t/h |
| Cake at 85 percent solids | 100 ÷ 0.85 | 117.6 t/h, of which water 17.6 t/h |
| Water per tonne of dry solids, slurry and cake | 185.7 ÷ 100 and 17.6 ÷ 100 | 1.86 t and 0.18 t, about ten times less |
| Water kept off the facility by the dry stack | 185.7 − 17.6 | 168.1 t/h |
| The same, over a year | 168.1 × 8,000 (1 t of water is about 1 m³) | about 1.34 million m³ |
| Dry solids to store in a year | 100 × 8,000 | 800,000 t |
| Volume at a settled dry density of 1.2 t/m³ (slurry) | 800,000 ÷ 1.2 | about 667,000 m³ |
| Volume at a compacted dry density of 1.6 t/m³ (dry stack) | 800,000 ÷ 1.6 | 500,000 m³, about 25 percent less |
The cake still carries some water, so the saving is large but not complete. The price is the energy and the cost of filtering, which is why the choice is made for each site.
Assumed inputs, not data from a particular plant. The densities are examples. A real design uses tests on the tailings.
Safety: a tailings facility is an engineered structure, designed and reviewed by qualified geotechnical engineers and regulated. The best method depends on the site, the climate, the ground, the earthquake risk and the tailings. This lesson explains principles. It is education, not a design guide and not a procedure.
The water in a tonne of slurry is what is left after the solids are taken out. At 35 percent solids there is 1.86 t of water for each tonne of dry solids. At 85 percent there is 0.18 t, about ten times less. That water does not have to be held in a pond or in the pores of the tailings.
Each raise rests partly on settled tailings, which are loose and full of water. If the tailings are wet, they are weak, and in strong shaking loose saturated tailings can lose their strength. Downstream raises rest on the earlier wall and on firm ground instead.
The cake is damp, not liquid, and it is compacted in layers, so it holds its own shape and has almost no free water to hold back. The water that does seep through is carried away by a drain at the base.