Maintain the master list of documents to be produced and handed over on a project, tracking type, discipline, tier, status, progress, responsibility and dates. With the Management module, plan the hours first in the project estimate.
Last updated: November 2026
The Deliverable Register is the per-project document delivery register — the master list of every document to be produced and handed over. It tracks each deliverable's type, discipline, criticality tier, status, progress %, responsible person, and planned/forecast/actual dates.
| Status | When it applies |
|---|---|
| Issued for Design | Design stage issue |
| Issued for Internal Review | Sent for internal checking |
| Issued for Client Review | Sent to the client for review |
| Issued for Tender | Issued for tender purposes |
| Issued for Construction | Formally issued for construction |
| As-Built | Completed (auto-set at 100% progress) |
Tiers mark criticality: T1 Critical, T2 Significant, T3 Standard. The register filter row lets you view All / Overdue / Due Soon / Unlinked, plus per-type buttons (cPDs, cTDs, cPFDs, Datasheets, Lists, Calculations, Piping Systems, Specifications, IsoMets).
{project_number}_deliverables.csv with Doc #, Title, Type, Discipline, Tier, Status, Progress %, Responsible, Planned/Forecast/Actual dates, Handover, Client Approval, and Notes.The project estimate works out how many hours the project will take, role by role, before the register exists. You pick tasks from your company's estimating template, say how many of each, and the page adds the hours up. Once the estimate is approved it can generate the Deliverable Register, with budget hours already on every row.
The template is the list of tasks (a drawing, a calculation, a datasheet, a HAZOP, a month of project management …) with the hours each takes. EngCoSuite supplies a starting template of more than 120 tasks in eight disciplines. The first time your organisation opens it, it is copied and from then on the copy is yours: later improvements to our template never change it.
each, per week or per month. Hours are whole numbers, always rounded up.Changing the template never moves an estimate that already exists: hours are copied onto a line when you add the task.
| Thing | How it works |
|---|---|
| Hours of a line | For each role: the template hours per unit × Qty × Factor, rounded up to a whole hour. The line's Hours is the sum over the roles. Example: 3 h × Qty 2 × Factor 1.25 = 7.5, shown as 8 h. |
| Typing an hour box | Changes that line only, never the template. What you type is the hours of the whole line, at the Qty and Factor it has now. |
| Summary at the top | Total hours per role with their share, total hours and days of 8 hours, and hours by WBS section. It moves as you type. |
| Column widths | Drag the right edge of a column heading to make that column wider or narrower; every WBS section follows, so the columns stay in line. Double-click the edge to put that column back to its standard width. The widths are kept in your browser, not in the estimate. |
| Sections | Rename a section by typing in its name box. + Add WBS under a section inserts a new one after it; an empty section has a × to remove it. The arrow at the left collapses a section (the tasks are hidden, not removed). |
| Moving things | Drag the move icon of a line to another place or section, or of a section to reorder sections. A green line shows where it would land; Esc cancels. Desktop browsers only, not touch screens. |
| Removing a line | The × at the end of the row. |
| Limits | 500 lines and 40 WBS sections in one estimate. Qty must be 0 or more, the Factor above 0 and up to 100. |
An estimate is in one of these states, shown in a banner at the top of the page:
| State | What it means |
|---|---|
| Draft | Not yet sent for review (or its review was cancelled). Lines can be changed, and the Excel import is available. |
| Sent for review / Checked | With the checker, then with the approver. The estimate is locked meanwhile. |
| Sent back | The reviewer asked for changes. Read the comments in the workflow, change the estimate here and save, then use Resubmit in the workflow. |
| Approved | Locked. Generate Deliverable Register appears. |
| Baseline | The register was generated from it. The estimate is read-only for good, and the banner compares the register's size now with the baseline. |
each makes as many register rows as its Qty (rounded up); every other line counted in each (project management, a HAZOP, a site visit …) makes actions; a per week or per month line makes one recurring action carrying the whole line's hours. A line may make up to 200 rows, an estimate up to 1000.Anyone who can open the estimate can export it, in any state.
Estimate_{project}_{date}.pdf, landscape A4: the lines by WBS section with the hours of each role, the state of the estimate (draft, under review, approved by whom and when, or baseline), then a summary by role and by discipline.Estimate_{project}_{date}.xlsx, a workbook for someone who is not on the system. It has three sheets:
When someone has changed the exported workbook (a colleague or the client, outside EngCoSuite), bring their changes back with Import from Excel. The button is there for people who can edit the estimate, and only while it can be changed: as a draft or after it was sent back.
.xlsx file and press Check the file.What happens to each line
| In the file | In the estimate |
|---|---|
| A row with its line id and different values | Changed: the line takes the file's section, Ref, task, discipline, deliverable, unit, Qty, Factor, hours per unit and note. The change is listed in words, for example which hours went from what to what. |
| A row with its line id and nothing different | Unchanged. |
| A row without a line id (typed in a free row) | Added as a new line. It needs a Task, a Discipline and a Deliverable from the lists, a Unit and a Qty. A WBS section name that does not exist yet creates that section. |
| A line of the estimate that is missing from the file (row deleted or cleared) | Removed. |
| A row with a bad number, no task, no quantity, or a discipline / deliverable not in the lists on a new line | Skipped, with a warning naming the row. On an existing line a mistyped discipline or deliverable keeps the old one, with a warning. |
When the file is refused
.xlsx file (an .xls, a macro workbook .xlsm, a CSV or a PDF), is larger than 10 MB, or cannot be opened.If the estimate was saved again after the file was exported, you get a warning with the date: applying the file replaces those later changes with what is in the file.
| Issue | What to do |
|---|---|
| “This project is archived. Deliverables cannot be modified.” | Re-open the project or ask the project owner; archived projects are read-only. |
| My deliverable is stuck at one status | Set Progress to 100% to automatically move it to As-Built. |
| I created a deliverable but don't see a document file | Type Other doesn't create a file. For real types, the document was created at Rev A and is linked. |
| There is no Estimate button | The estimate needs the Management module of the project's organisation, and is not shown to clients. |
| The estimate will not save, or Import from Excel is missing | The estimate is under review, approved, or already the baseline of the register. Only a draft, or an estimate that was sent back, can be changed. |
| “This file was exported from another project's estimate” | Use the workbook exported from this project's own estimate page; a signed workbook from another project is refused. |
| I can't edit or export | Changes and CSV export require project edit rights (or superadmin). |
What is Project Completeness?
A percentage calculated from the register, updated in real time as deliverable progress changes.
Can a deliverable point to an existing document?
Yes — pick it from the Existing Document dropdown, or link one later with the link icon.
How do I track a deliverable that isn't one of the nine document types?
Use type Other — it doesn't create a system file but tracks the item like any other deliverable.
How are the hours of an estimate line worked out?
For each role: the template hours per unit × Qty × Factor, rounded up to a whole hour. The line's hours are the sum over the roles.
Can I change the estimate after it is approved?
No. While it is under review or approved it is locked. If the reviewer sends it back you can change it again; once the Deliverable Register has been generated from it, it is the baseline and stays read-only.
What does Import from Excel do to lines that are not in the file?
They are removed from the estimate. You see the list of added, changed and removed lines before anything is stored, and can close the dialog to cancel.
Does deleting a deliverable delete the document?
No — delete only soft-deactivates the register row; the linked document file is untouched.