From sizing to purchase: a paste pump or mixer, start to finish

The whole job in order: set up the project, size the line, write the datasheet, find vendors, send an enquiry, compare the answers and evaluate the bids. Each step points to a guide with the detail.

← All guides

Before you start

Datasheets and Calculations are on every plan (a free plan has a monthly limit on how many documents of each type you can add). Vendor enquiries and the technical bid evaluation need the Management module.

1 Set up the project

Everything you make belongs to a project, and a project belongs to a client. Add the client and the project once, then add each document from the project page.

Open Projects →

Guide: Start a project and add your first document →

2 Size the line the pump will work against

For a paste, use the Pipe Pressure Drop (Bingham Paste) calculation block. It gives the friction pressure, the discharge pressure the pump must deliver and the start-up pressure needed to restart a settled line. For a water or thin slurry line use the pump sizing and pipe blocks, or a Piping System.

Guide: Size a paste pipeline and the pressure a paste pump needs →

3 Write the datasheet

Add a datasheet of type Pump and SubType Paste (or a Mixer: Paste, Screw or Vortex). Enter your product and duty values, put the result of the line calculation under System, and leave what the vendor must decide blank or as VTA.

Guide: Specify a pump or mixer on a datasheet →

4 Find vendors

Start a vendor enquiry from the datasheet, then add vendors from your own list and the suggestions on the enquiry page. The supplier catalogue lists a few makers for paste pumps and for paste, screw and vortex mixers; most mixer makers publish no power range, so they show as "check". Add your own vendors as well.

Guide: Find vendors for a datasheet →

5 Send the enquiry and collect the answers

Issue the enquiry, send each vendor a private link or an Excel file, and bring the answers back. Lines you filled in are confirmed or taken exception to; blank lines are advised.

Where: Doc Control > Vendor Enquiries

Guide: Run a vendor enquiry from a datasheet or the project page →

6 Compare the bids and evaluate them

Compare the vendors line by line, give each answer a verdict, set the mandatory lines as gates, score the criteria and record a recommendation. Download the report as PDF or Excel.

Guide: Compare vendors and write the technical bid evaluation (TBE) →

7 Record the choice and issue the documents

Award the enquiry, then take the chosen vendor's values into new revisions of your datasheets. Send the datasheet through a review workflow and issue it to the client on a transmittal.

Guide: Issue a document for review: workflow, then transmittal →

Tips

  • Do the line calculation before the datasheet: its results fill several lines of the datasheet (pressure required, start-up pressure).
  • One kind of equipment per enquiry. A vendor receives every datasheet in the enquiry, so a pump vendor should not be asked to answer a mixer datasheet.
  • The enquiry never changes your datasheet. Only the Take ... values into the datasheets page writes anything, and it makes a new revision.

Common mistakes

  • Sending the enquiry before the datasheet is at the revision you want: the datasheet is frozen at its latest revision when you issue.
  • Treating a catalogue range as a quote. It is what the maker publishes, not a promise that it can meet your duty.

Something here does not match what you see, or your question is not covered? Tell us.