Room and pillar, longwall, stoping and caving compared in one cut through the ground.
An underground mine reaches an ore body or a coal seam by a shaft or a ramp, and removes the rock by a mining method. The method is chosen to fit the shape of the deposit, the strength of the rock, the depth, the grade and the cost. The main families are room and pillar (leave rock standing to hold the roof), longwall (hold the roof at the face only and let it fall behind), open stoping with fill (leave an open void, then fill it) and caving (let the rock break itself). Each of the main ones has its own lesson.
The animation is one cut through the ground that shows four methods and the services they share, side by side. In a real mine one or two methods are used, so the picture is a comparison, not a mine. Click the machines: the headframe opens shaft hoist, the supports open longwall, the loader and rig in the stope open sublevel open stoping, the loader under the cave opens block caving and the fan opens mine ventilation. Surface mining is the other choice: see the open pit operation.
The steps go from the shaft to each method in turn, and finish with the air that all of them need.
The table gives typical figures for the four main methods. They vary widely with the deposit and the mine.
| Method | Suits | Typical recovery of the ore |
|---|---|---|
| Room and pillar | Flat seams or ore bodies, shallow to moderate depth | roughly 50 to 70 percent |
| Longwall | Regular, flat, thick coal seams | roughly 75 to 90 percent |
| Sublevel open stoping with fill | Steep ore bodies in strong rock | roughly 70 to 90 percent |
| Block caving | Large, massive ore bodies that will cave | roughly 80 to 95 percent |
Worked example. Suppose a massive ore body of 10 Mt (million tonnes) could be mined either by sublevel open stoping with fill or by block caving. Assume that stoping recovers 80 percent of the ore, that 10 percent of the tonnes mined are waste, and that the cost is 50 cost units per tonne mined; and that caving recovers 90 percent, with 20 percent waste in the tonnes mined and 15 cost units per tonne mined. (The cost units are an assumed relative figure, not money.)
| Quantity | Working | Result |
|---|---|---|
| Stoping: ore recovered | 10 × 0.80 | 8.0 Mt |
| Stoping: tonnes mined | 8.0 ÷ (1 − 0.10) | about 8.89 Mt |
| Stoping: total cost | 8.89 × 50 | about 444 million units |
| Stoping: cost per tonne of ore recovered | 444 ÷ 8.0 | about 55.6 units |
| Caving: ore recovered | 10 × 0.90 | 9.0 Mt |
| Caving: tonnes mined | 9.0 ÷ (1 − 0.20) | 11.25 Mt |
| Caving: total cost | 11.25 × 15 | about 169 million units |
| Caving: cost per tonne of ore recovered | 168.75 ÷ 9.0 | 18.75 units |
Caving costs much less per tonne of ore and recovers more, but it takes more waste with the ore, needs a large up-front investment before the first ore is drawn and works only if the rock caves as expected. The decision is never made on one cost figure.
Assumed inputs, not data from a particular mine or ore body.
Safety: underground mining is regulated and dangerous. Falls of ground, gas, dust, heat, blasting, fire and moving machines are controlled by each mine's own safety management system and by the rules of the regulator. This lesson is education about principles, not a procedure, a design or a recommendation of a method.
Sublevel open stoping with fill. The rock is strong enough for a large void to stand open while it is mined, and the dip lets the broken ore fall to the draw points.
Longwall and caving rely on the rock to break and fall in a controlled way, and the rock above is allowed to settle. In open stoping the walls must stay up, so the void is filled to support them and the next stope.
The methods differ in recovery, dilution, the investment needed before the first ore, how safely they can be run in the ground and how well they suit the shape of the deposit.